| Sign In | Join Free | My chinalane.org |
|
MOQ : 500 square meters
Price : USD15.8-USD28.7/sqm
Payment Terms : T/T
Supply Ability : 10000000 square meters per month
Delivery Time : 15-25 days
Packaging Details : Our export packing : 1. Steel (bundling and packaging) 2. Equipment, spare parts (wooden cases, carton packaging) 3. PC sheet, glass, film, and other independent packaging
Product name : Commercial Hot Galvanized Steel Frame Large Venlo Multi-Span Glass Greenhouse
Structure : Hot galvanized steel
Roof Molding : Triangle
Cover material : Glass, fitted by special aluminum profiles
Feature : Stable Structure Easily Assembled
Heating System : Boiler and heating fans
Ventilation : Top Ventilation+Side Ventilation
Width : 9.6m/10.8m/12m
Cooling system : Pad and Fan System
Usage : lettuce/pepper/tomato/cucumber/eggplant
Glass greenhouse has a modern and novel in exterior, and has a stable structure.
It adopts hot galvanized pipes connected by the hot-galvanized bolts and tapping screws, without any welding point, So it is strong and practical and also simple beautiful in over all.
| Item | Multi-Span Glass Greenhouses |
|---|---|
| Roof type | Venlo roof |
| Span width | 6.2m/6.4m/8m/9.6m/10.8m |
| Cover Material | Glass |
| Length | Customed |
| Height | 3.5-12m |
| Gutter height | 2.5m-10m |
| Frame Structure | Hot dip galvanized steel |
| Ventilation | roof vent / side vent |
| Glass Thickness | 4mm, 5mm etc |
| Coverage | Glass, fitted by special aluminum profiles |






Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 20-35 days after order.
Q: How to install the greenhouse? Do you provide installation service?
A:we will send engineer to do installation guidance.
Q: Do you provide sample?Is it free or extra?
A: Yes, we could offer the sample for free charge but the freight is on buyer's account.
Q: What preparations I should be before installation?
A: First finish the greenhouse building authorization from the government if required. Second prepare the tools as per the tool list we send to you. Third prepare the workers. Forth prepare the power supply if needed. Fifth prepare one place that can store the greenhouse materials after arrival to protect it from rain if needed.
|
|
Commercial Multi-Span Venlo Glass Greenhouse with Hot Galvanized Steel Frame and Triangle Roof Molding Images |